ATC
- ARTCC: Air Route Traffic Control Centers.
- manage traffic in the en route airspace.
- callsign:
center
. - only 22 ARTCCs in the US.
- e.g. Oakland Center.
- https://www.faa.gov/about/office_org/headquarters_offices/ato/service_units/air_traffic_services/artcc
- TRACON: Terminal Radar Approach Control Facilities.
- manage the airspace surrounding busy airports; handle the airspace below 20,000 feet and within 30 to 50 miles of the airport.
- callsign:
approach
,departure
. - only 27 TRACON in the US.
- e.g. NorCal Approach, serves San Francisco, San Jose, Oakland, Sacramento, Reno plus the other smaller airports with airport traffic control towers.
- Tower / Ground / Ramp
- FSS: Flight Service Station.
- not responsible for giving instructions or clearances or providing separation.
- callsign:
radio
. - not controlling traffic.
- e.g. Oakland Radio, Prescott Radio.
Tower vs ARTCC vs TRACON
Towers handle airport operations, ARTCCs/En-route handle cruise phase, and TRACONs handle climbing and descending aircraft, as well as aircraft transiting between ARTCCs in their controlled areas.
Tower and TRACON
TRACON may be on a separate site or colocate with a tower. For example, California has 5 TRACON, 3 of them colocate with a tower (Santa Barbara, Fresno, Bakersfield) and 2 are independent (Northern California TRACON, near Sacramento; Southern California TRACON, near San Diego).
Clearance Frequency
Clearance Delivery Frequency is initial clearance from ATC before you take off.